Palm Beach Aquatic Centre | Gold Coast

Arcmech was contracted to design, build and install two powder coated stainless steel switchboards along with the full Mechanical Electrical requirements for the Palm Beach Aquatic Centre project. 

Due to its outdoor location near saltwater, it was an absolute necessity that the Mechanical Services Switchboards were stainless steel.  With superior corrosion resistance, they ensure uninterrupted performance and longevity in harsh coastal environments.

Palm Beach Aquatic Centre Mecelec Project
Mechanical Electrical works for Palm Beach Aquatic Centre
Arcmech MSSB project for Palm Beach Aquatic Centre
Stainless steel MSSB for Palm Beach Aquatic Centre
Palm Beach Aquatic Centre | Gold Coast